The Complete Kitchen Remodel Guide for 2026

Real costs. Real timelines. Real process — based on 50 permitted kitchen projects in Raleigh, NC and over 20 years of renovation experience. No guesswork. No surprises.

2026 Investment Summary

What Does a Kitchen Remodel Cost in Raleigh?

Every kitchen is different — but costs aren’t random. Here’s what Lavish has seen across 50 turn-key, permitted kitchen projects, broken down by category so you can see exactly where your budget goes.

Category What it covers 2026 Range
Cabinets Factory finish refacing to fully custom new cabinetry $15K – $75K
Appliances GE entry-level to Wolf / Sub-Zero professional grade $15K – $50K
Flooring Patching existing to new hardwoods or tile $5K – $25K
Countertops Quartz or granite to marble or quartzite $10K – $25K
Plumbing Replace in place to full relocation and new fixtures $15K – $30K
Lighting Replace existing to full new layout and fixtures $15K – $30K
HVAC & Mechanical Floor vents to custom hood ventilation $5K – $10K
Walls, Painting & Structural Paint refresh to removing or adding walls $10K – $25K
Lavish Design & Implementation Full design, project management, and coordination $10K – $20K

Turn-key average investment range

$100K – $290K

These ranges include everything: design, materials, licensed installers, the permitting process, and project management. When you work with Lavish, there is no separate line item for “general contractor markup” that appears later. What you see above is the complete picture — because we handle it all in-house.

Ranges based on 50 turn-key permitted projects in the Raleigh/Wilmington area. Costs may vary based on scope, structural conditions, and material selections.

 

The 5-Phase Process

How a Kitchen Remodel Actually Works

Most homeowners are surprised by how much happens before a single wall comes down. Here is how Lavish structures every kitchen remodel — from the first conversation to the final photo shoot.

01

Design & Planning

Everything before construction — land the vision and project plan

Duration

7–13 Weeks

Investment

$15K–$30K

Lavish Hours

30–60 hrs

This is where the real work begins — and where most remodels either succeed or struggle. Before we touch a single wall, our design team works through every detail so that construction is a process of executing a clear plan, not making decisions on the fly. Payment #1 purchases your Lavish design hours to start the process.

  • Onsite design meetings and vendor walkthroughs to land the vision
  • Initial design concepts and budget prioritization
  • Material selections: flooring, hardware, lighting, countertops, backsplash, paint
  • Cabinet and storage layout finalized — new custom, stock size, or painted
  • Appliance model numbers confirmed and installation requirements noted
  • Plumbing fixture selections: sinks, faucets, dishwasher, disposal, ice maker
  • Electrical and can light layout, outlet and switch placement
  • HVAC and mechanical: hood specifications matched to appliances
  • Engineering or survey documents obtained if required
  • Architectural drawings for any exterior elevations (30–90 days if needed)
  • Final design boards approved by client before Phase 2 begins

02

Invest & Launch

Procure all materials, permits, and set job site expectations

Duration

9–13 Weeks

Investment

$45K–$145K

Lavish Hours

20–30 hrs

This phase is about momentum and preparation. We pull permits (which takes an average of 10–45 days in Wake County), order and schedule delivery of all materials, and establish clear expectations with you about how your home will operate during construction. Payment #2 is tied to the signed construction agreement.

  • Construction agreement approved and signed
  • Permit application filed and all documentation submitted
  • All materials ordered with delivery schedule confirmed
  • Onsite meeting to set job site expectations: home access, storage, dumpster, porta john placement, pet protocol
  • Alternate kitchen setup plan created and communicated
  • Written recap of all site expectations emailed to client
  • Timeline projections shared and confirmed

03

Transformation Begins

Demolition, framing, and rough-ins — everything behind the walls

Duration

6–12 Weeks

Investment

$25K–$80K

Lavish Hours

10–20 hrs

Demo day is the milestone clients most look forward to — and the phase that most reveals what’s actually inside the walls. Unforeseen conditions like rot, mold, or out-of-code wiring are addressed here with full transparency. Any additional work is documented and approved before it begins. Payment #3 is due on demo day.

  • Site cleared and protected: electrical and plumbing sealed at demo start
  • Unforeseen conditions identified and documented (rot, mold, code issues)
  • Additional Time and Work Authorizations (ATWA) issued and approved as needed
  • Framing alterations completed: structural or aesthetic from floor to ceiling
  • Electrical, mechanical, and plumbing rough-in completed
  • Onsite design and build meeting to finalize behind-wall locations before close-up
  • Insulation installed

04

Installation

Mid-project inspections passed and all finishes installed

Duration

6–12 Weeks

Investment

$10K–$25K

Lavish Hours

10–20 hrs

This is when your kitchen begins to look like itself. Five inspections must be passed — plumbing, electrical, HVAC, framing, and insulation — before walls close. Then everything you selected in Phase 1 goes in. Payment #4 follows passing those inspections.

  • 5 inspection areas passed: plumbing, electrical, HVAC, framing, insulation
  • Drywall installed and finished
  • Interior trim and millwork: crown, doors, baseboards installed
  • Cabinet installation and countertop template taken
  • Onsite meeting: final height and location of lighting, plumbing, HVAC, accessories
  • Interior painting completed
  • Countertops and backsplash installed
  • Plumbing, lighting, electrical, and HVAC connected and operational
  • Flooring installed or refinished

05

Last Mile & Extra Mile

Final inspections, adjustments, cleaning, and photo shoot

Duration

4–9 Weeks

Investment

$5K–$10K

Lavish Hours

10–15 hrs

We don’t hand you keys and disappear. This phase is where Lavish earns its name — the final inspections, the punch list, the professional cleaning, the photo shoot, and the leadership sign-off. A 1-year warranty certificate is issued at this phase. Payment #5 follows the final inspection pass.

  • Final safety inspections passed: plumbing, electrical, HVAC, fire, accessibility
  • Certificate of Occupancy and 1-Year Warranty issued
  • Onsite punch list creation with design and build team
  • All punch list items resolved and confirmed
  • Final professional cleaning
  • Professional photo shoot
  • Leadership approval and full team sign-off meeting

Timeline Overview

How Long Does a Kitchen Remodel Take?

Phase 1 — Design
7–13 wks
7–13 wks
Phase 2 — Launch
7–13 wks
9–13 wks
Phase 3 — Demo & Rough-In
7–13 wks
6–12 wks
Phase 4 — Installation
7–13 wks
6–12 wks
Phase 5 — Final Mile
7–13 wks
4–9 wks

Total time investment

32 to 59 Weeks

Average full kitchen including design: 7 to 13 months
You may be out of your kitchen for 8 to 16 weeks during active construction

What affects your timeline?

Permit processing (10–45 days in Wake County)
Custom cabinet lead times (8–16 weeks)
Appliance availability and delivery
Unforeseen structural conditions
Countertop template and fabrication (2–3 weeks)

What Homeowners Ask Us Most

Questions Worth Answering Honestly

Why does a kitchen remodel take so long before construction even starts?

The 7–13 weeks of Phase 1 are the most valuable weeks of your project. Every decision that isn’t made before construction begins becomes a delay — or worse, a costly change order — during construction. Our design team works through every finish, fixture, and fitting in advance so that when the demo crew shows up, there is a clear, complete plan. The projects that go smoothest are the ones where Phase 1 was done thoroughly. Rushed design equals extended construction.

What does “$100K to $290K” actually mean — where does that money go?

The wide range reflects real variation in choices. A $100K kitchen uses factory-painted cabinets, GE appliances, and quartz countertops — beautiful, functional, and well-built. A $290K kitchen uses fully custom cabinetry, Wolf or Sub-Zero appliances, and quartzite or marble countertops with structural work involved. Neither is wrong — they’re just different kitchens. Our job in Phase 1 is to help you understand where your investment will have the most visible and lasting impact, and build a scope that matches your priorities.

How long will we be without a working kitchen?

Typically 8 to 16 weeks during active construction — Phase 3 through the beginning of Phase 4. We work with every client to set up a temporary kitchen area before demo day so that your household isn’t left without any food prep space. We document and communicate this plan in writing before construction begins.

What is a permitted kitchen remodel and why does it matter?

A permitted remodel means every stage of the work is reviewed and approved by your municipality’s building department. Electrical, plumbing, structural, HVAC, and fire safety are all inspected by a licensed inspector — not just by us. This protects your investment, your homeowner’s insurance, and your ability to sell the home. Lavish handles the permitting process on every project. All 50 projects reflected in this guide were fully permitted.

What happens if something unexpected is found behind the walls?

It happens. Rot, mold, outdated wiring, plumbing that isn’t to current code — these are real and relatively common in older Raleigh homes. When we find something, we stop, document it, and present an Additional Time and Work Authorization (ATWA) before doing anything further. You always know what’s happening and why before we spend a dollar more. Transparency at this stage is non-negotiable for us.

Why choose Lavish over a general contractor?

Most general contractors hire a separate design firm, manage third-party subs, and coordinate across teams who don’t always communicate well. Lavish is design, build, and real estate under one roof. The designer who selects your countertops is in the same building as the project manager overseeing installation. There is no blame-shifting between “the designer” and “the contractor.” There is one team, one plan, and one point of accountability — us. We also understand the resale implications of every decision we make, because we also operate in real estate.